AEP Elical recently supported AEMO, Australia’s Energy Market Operator, with an assessment of the reliability of the coal fired power stations in the National Electricity Market (NEM).
AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.
AEP Elical was chosen to provide an expert independent review into the Power Station Control System at a mine site which utilised cutting-edge renewable technology.
This project included the upgrade of the lead smelting facility and introduction of the advanced metal recovery facility at Nyrstar's Port Pirie operations.
AEP Elical successfully completed engineering design updates and verification of the ETAP Load Flow model for the electrical assets at MMG’s Rosebery copper mine.
This project included the upgrade of the lead smelting facility and introduction of the advanced metal recovery facility at Nyrstar's Port Pirie operations.
AEP Elical was engaged to undertake the facilitation of a Control Hazard and Operability Analysis (CHAZOP) process for the BMA Blackwater Mine product handling system changes.
AEP Elical performed a structural audit on existing TPC ROM Hopper concrete structure and the capacity of the structure to accommodate the loading cases associated w/ ROM grizzly re-design (by AEP Elical also).
AEP Elical completed an asset condition for the BMA Goonyella and Riverside coal processing facilities, including stockpile areas, processing plants and the train load-out facilities as part of the Goonyella Expansion selection phase study.
Concept level (identification phase) study to upgrade the existing Blackwater Thermal Coal Plant (TCP) to produce 600,000 tonnes per annum of a specific sized product (Corex).