AEP Elical recently supported AEMO, Australia’s Energy Market Operator, with an assessment of the reliability of the coal fired power stations in the National Electricity Market (NEM).
AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.
AEP Elical was chosen to provide an expert independent review into the Power Station Control System at a mine site which utilised cutting-edge renewable technology.
This project included the upgrade of the lead smelting facility and introduction of the advanced metal recovery facility at Nyrstar's Port Pirie operations.
AEP Elical undertook the electrical, controls and communications work associated with the study to conduct a high-level condition assessment and then develop an order of magnitude estimate for capital expenditure for the electrical infrastructure.
AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.
AEP Elical was engaged to perform electrical safety review and basic electrical field checks across the site to evaluate and report on site management and control for effective current safe systems on work.
AEP Elical was engaged to undertake a structural inspection and condition report on the copper smelter crushing plant, a concept design to improve access to the bosh tank and a preliminary inspection of one of the two cooling towers.
AEP Elical completed an asset condition for the BMA Goonyella and Riverside coal processing facilities, including stockpile areas, processing plants and the train load-out facilities as part of the Goonyella Expansion selection phase study.